Difference: FkwSTEP09CRABserver (2 vs. 3)

Revision 32009/05/24 - Main.FkW

Line: 1 to 1
 
META TOPICPARENT name="FkwSTEP09GlideinWMS"
Line: 44 to 44
 
    • do daily crab server logfile analysis
    • assembly daily status report for T2 listserv.
    • assemble weekly reports
Added:
>
>
  • after STEP09:
    • understand the scheduling rate limits of the CRAB server at UCSD. I.e., at this point we push hard on the number of jobs per day, until we break the system. We then watch how it breaks, and figure out how to recover from failure, as well as how to monitor the system to detect the failure quickly.
  -- FkW - 2009/05/23 \ No newline at end of file
 